Commercial Plumbing in
Red Oak, TX

Underground rough-in goes in before the slab is poured. It is the one stage nobody gets to redo, so it is the one we get right.

Call (469) 505-8362

New Build Scope

From the pipe under the slab to the last fixture, each stage inspected before the next one covers it.

Includes

  • Underground rough-in
  • Above-slab rough-in and top-out
  • Supply, drain, waste and vent systems
  • Fixture set and trim-out
  • Permit pull and city inspections
  • GC coordination on multi-family and commercial

Permit-Ready, Every Stage

Buried Once.
Done Right the First Time.

Underground rough-in goes in before the slab is poured, and once the concrete is down nobody gets to look at it again. That is why new-construction plumbing runs in inspected stages: underground, then top-out, then fixture set, each passing before the next covers it. Daniel Clayburn holds Texas Master Plumber license RMP-44569 and meets the inspector at every stage.

New construction is one of the plumbing services X-Act runs out of Red Oak, alongside remodel and repair work, for single-family, multi-family and commercial tenant build-outs across Ellis County.

What are the stages of new-construction plumbing?

Three, each with its own inspection. Underground is the drain, waste and vent piping and the water service set in the ground before the slab, staked to the plan and tested. Top-out is everything inside the open framing: supply lines, vents through the roof, the tub and shower valves, gas if the building has it. Fixture set is the last visit, after finishes, when sinks, toilets, water heaters and equipment connect and the whole system goes under pressure for final.

Stage What goes in What the inspector checks
Underground DWV under the slab, water service, cleanouts Slope, fittings, a water or air test before backfill
Top-out Supply, vents, valves, gas rough Pressure test on supply and gas, vent terminations, protection plates
Fixture set / final Fixtures, water heaters, equipment Everything connected, pressurized, no leaks, T&P and pan where required

How do you coordinate with a general contractor?

We work to the GC’s schedule and communicate with the project manager directly, not through the homeowner. Rough-in dates are set against the pour and the framing walk, inspections get booked when the stage is ready rather than after the framer has closed the wall, and if a layout on the plan won’t pass, that conversation happens at underground, not at final.

The limit worth stating: underground can’t start until the pad is graded and the lines are staked, and a slip upstream of us moves our dates too. We don’t absorb a schedule we don’t control, and we’d rather say that at bid than on the day.

Do you take multi-family and commercial projects?

Yes: tenant build-outs, multi-family, and light commercial new construction, along with new residential. Growth along US-287 in Midlothian and the subdivisions filling in around Glenn Heights keep both sides of that busy. Commercial work has its own wrinkles. A restaurant space wants a grease interceptor sized to the kitchen, and the service wants backflow protection the city will inspect; both get specified before the underground goes in rather than retrofitted after a failed final. On a build with a hard opening date, that sequencing is the difference between a certificate of occupancy on time and a month of re-inspections.

What does a rough-in inspection actually check?

The things that fail badly when they’re wrong and can’t be seen later. Slope on the drain lines so waste moves. Fittings that let a cable through a cleanout instead of dead-ending. Supply held under test pressure with a gauge the inspector reads. Vents that terminate where code says and not into an attic. Nail plates where pipe passes framing. A rough-in that passes the first time is the difference between a schedule that holds and a week lost waiting on a re-inspection.

Common Questions

Commercial & New Build FAQ

Do you take large commercial plumbing projects?

Yes. Small tenant build-outs through multi-family and light-commercial new construction, working directly with the general contractor on scheduling, inspections and submittals. Underground, top-out and fixture set are each inspected, and the permit is pulled under Texas Master Plumber license RMP-44569.

What is a plumbing rough-in?

The stage where supply, drain and vent lines are run through the ground, walls and floors before concrete is poured or drywall goes up. It has to pass a city inspection before it gets covered, because nobody can see it afterward. Underground rough-in happens before the slab; above-slab rough-in and top-out happen with the framing open.

Can you work with our general contractor?

That is how most of our new-construction work runs. We coordinate rough-in dates against the pour and the framing walk, book inspections when a stage is ready, and talk to your project manager directly. If a layout on the plans will not pass, you hear it at underground rather than at final.

What do you need from us to price a new build?

The plumbing plans, the fixture schedule, and a construction schedule with the pour and framing dates. A bid from a napkin sketch gets revised on site, and revisions on a job with a pour date are expensive for everyone. With real drawings we can price each stage and tell you where the inspections fall.

Who pulls the plumbing permit on a commercial job?

The Responsible Master Plumber on the license, in their own name. That is Daniel Clayburn, RMP-44569, for X-Act. A journeyman card cannot pull a permit, and the city holds the RMP accountable for the work, which is why the RMP number on a bid is worth checking on the Texas State Board of Plumbing Examiners license search.

Start Your Build Right

Send the Plans.
We’ll Price the Stages.

Commercial, multi-family and new residential plumbing across Red Oak, Midlothian, Waxahachie and Ellis County.

Call Us